Location
Peshawar
Project Size
10KW
Solar Panels
JA Solar 430W
Inverter
Inverex
In universities electricity required to run projectors, PCs, and in case of engineering university lab equipment definitely needs power to operate. Greater the equipment running time greater the electricity consumption thus the greater the electricity bill. For universities electricity bill is no big concern, their main concern is the power breakdown which causes loss to the students studies. To overcome this problem A university signed a contract to install the required solar system which can provide electricity without any disruption.