Location
Peshawar
Project Size
15 kW Ongrid + 5 kW Hybrid
Solar Panels
Jinko 460W
Inverter
ABB + Omega
Electricity is a critical requirement for any hospital since almost all medical equipment requires electricity for operation. A private hospital wanted to overcome electric crisis issues to keep running its major equipment. A contract was signed between the hospital and our company for the installment solar system which should be able to keep equipment running in case of power breakdown. The project was completed before the due date exceeding our client’s expectations.